Air Conditioning [page 4]

<=== Prev Next ===>


Monday–Wednesday, 12–14 Sep 2022

UV protectant applied

UV protectant applied

Strapped to stand-offs

Strapped to stand-offs

Lines covered

Lines covered

The first coat of UV proctant was applied before the power/control line was put in place. Then a second coat of UV protectant was added and all lines were strapped to stand offs. The lines runing down the wall were covered after some expanding foam used where the lines enter the house.

drain to downspout

drain to downspout

gap filler

gap filler

The drain line from the upstairs unit was extended and routed to the nearest roof downspout. Standoffs will be added to slightly raise the line from the room. Expanding foam was also added where the lines enter the house for the downstairs unit.

Heat pump anchored to pad

Heat pump anchored to pad

Drain termination

Drain termination

Mostly tidy

Mostly tidy

More clean-up. The heat pump is anchored to its pad and the lines leading to the heat pump have been tidied. Caulk has been applied where various lines exit the house. Small stand-offs have been caulked to the upstairs drain pipe, too. Most everything is done.

Thursday, 15 Sep 2022

Insulated lines

Insulated lines

more insulated lines

more insulated lines

caulked

caulked

That’s it. The last bit of bare copper tubing has been insulated and some caulk added around the inside access hole for the upstairs unit. I’ve started putting the things I moved out of the way back where they belong.

On to the next household project: our pool needs some love.

 

<=== Prev Next ===>