Friday/Saturday, 16–17 Oct 2009
On Friday the guys were here for a short time in the afternoon to fill in most of the hole in the street. I believe it is ready for asphalt. On Saturday they were back to break up the sidewalk to the nearest seam, throw some fill dirt in the trench on the hillside, clean up the back yard, and remove the patch in our slab so a new one could be poured, this time matching the height of the slab around the patch.
Ready for asphalt
Old cleanout
Break up sidewalk
Break to seam
Needs to come out
Too high
Back yard almost normal
Fill trench on hillside
Back yard
Chip up slab
Dust curtain
Too long this way
It all came out
Until Monday