Feb 19-23, 2001
The polished stone making up the “curb” between ween and dry areas was installed Tuesday. Still left to do are:
- Toilet room floor
- Tub platform floor
- Shower soffit walls
- Cabinet top
Once that is done the stone work will have to wait until the steel mounting brackets are installed for the wash area shelf and the tub deck.