Mar 5-9, 2001
This week’s days worth of stone work occurred Thursday. The contractor was here, too, preparing the cabinet top for its stone covering. The wash basins are going to be attached directly to the stone with adhesive and clamped to the wood base away from the lip. The wood supports were thus removed from both the sink and faucet/controls location. I checked that the cabinet doors clear the counter top – it makes it by about 1/4 inch. Perfect.