Apr 16-20, 2001
Taxes mailed, replacement Internet/DSL line installed, and finally some work on the bath remodel. The tub has been moved out of the way now that I’ve got the needed measurements. The electrician has been in making sure he’s got everything needed to get us power and lights, and the contractor is cutting holes in cabinets to mount the electrical boxes. The cabinet shelf is also being put in place, ready for it’s stone top.
The first picture shows the tub has been removed and the polished nickel post unwrapped. The second picture shows shelf location. The missing bit of cabinet is being cut for an electrical box. The third picture shows where one of the the boxes for the various light switches will go.