Home Improvements, 2003 [page 12]

<=== Prev Next ===>


External repairs complete (August 25-29)

The deck, gate, and stairs on the east side of the house are finished along with all of the trim on both sides of the house. We’re ready for this winter’s rain.

east deck railing

east deck railing

east deck railing
stair repairs

stair repairs

stair repairs
rail cap detail

rail cap detail

rail cap detail
gate less cap

gate less cap

gate less cap
closed gate

closed gate

closed gate
open gate

open gate

open gate

Inside the house the walls were insulated and new wallboard put up. I routed cables for phones, network access and ham radio antenna feed throughs before the wallboard went up in my office. Nothing special was needed in the bathroom.

boxes for network and phone

boxes for network and phone

boxes for network and phone
antenna and ground cables

antenna and ground cables

antenna and ground cables
lots of screws

lots of screws

lots of screws
bathroom repair

bathroom repair

bathroom repair

 

<=== Prev Next ===>